Woolwich Township Construction Office

 

Updated Phone Menu- Press #1 Construction Office

To schedule call 856-467-2666 Menu Option #1; #1 , calls must be received by 9:00a.m. to be placed on same day inspections.    

Uniform Construction Control Clerks:

Kathleen Barbato  ext.7201                                Britni Beecken ext. 7202

kbarbato@woolwichtwp.org                                 bbeecken@woolwichtwp.org 

 

  • Andy Hoglen Const. Official, Building Sub Code
  • William Miller, Building-Housing Inspector
  • Ted Smith, Electrical,  Sub Code
  • William Miller,  Zoning Official
  • Fabrizio Flaino, Plumbing Sub Code
  • Joseph B Tull Sr., Fire Sub Code

Before You Begin A Construction Project

Call the construction department to determine whether building, plumbing or electrical permits are necessary. These permits are issued for YOUR protection- for safety, insurance purposes and to ensure that contractors follow the most current building codes.

Building permits provide the means for Code Officials to protect residents by reducing the potential hazards of unsafe construction thereby ensuring the public health, safety and welfare. If you need a permit for the work, the permit process and fees will be explained to you by department personnel and necessary forms will be given out. The building permit process helps to explain what our local laws and ordinances require. Before any construction, demolition, or remodel work begins, an application for a permit must be made. Building permits provide the means for Code Officials to inspect construction during different phases of the project to ensure that appropriate materials are used and minimum standards are met.

There is certain construction work that you may be allowed to do without first obtaining a permit such as laying floor (not wall) tiles, painting, replacing same size windows or doors, repaving driveway with same material & size etc. If you are in doubt a call to the Construction Department is recommended.

Permits must be obtained before the start of work except that emergency replacement of furnaces, boilers and water heaters will be allowed as long as Construction Department is notified by phone at the time of replacement and permits are obtained within five days.


Contact the Construction Department Before Any of the Following Work is Performed

  • Electrical
  • Plumbing
  • Boiler / furnace / heating / air conditioning
  • Window replacement if changing size or type
  • Sheds
  • Signs
  • New building
  • Additions
  • Miscellaneous residential construction such as siding, decks, patios, driveways etc.
  • Renovations
  • Demolitions
  • Oil tank removal
  • Pools
  • Reroofing
  • Finishing basement